Case Study 10: Water Works on the Mersey Ship Canal
Clayton Reference CL006749
Site A major water treatment works on the Mersey Ship Canal.
Objective The site was problematic and required upgrading to provide automatic control and monitoring from the centralised control room.
Solution A comprehensive survey of the site was undertaken with information extracted from both the existing PLC systems and defining of new monitoring locations.
We designed, manufactured and programmed a number of PLC interface units to collect data from a variety of existing equipment.
Notes The system was installed and commissioned to the client’s requirements on an accelerated program which was not achievable through the conventional framework routes.
Customer information available for reference.