Group Companies Group Information Contact & Find Us
Case Study 11: Potable Water Booster Station
Clayton Reference CL003597
Site A potable water booster station.
Objective To install a new booster station to facilitate the decommissioning of a potable water service reservoir tower which had become unstable.
Solution The design, manufacture and installation of a complete M&E package complete with a motor control centre, dedicated standby generator, multistage potable water pumps and associated ancillary equipment.
Notes The installation required shutdowns to be undertaken at periods of low demands to allow for connection into the existing pumping main within a restricted time period.
Customer information available for reference.
Group Services Group Services
CASE STUDIES
1: Main Water Filter
for Holiday Town 2: Critical Raw Water
Pumping Station 3: Offshore Water
Treatment Works 4: Major Urban Waste
Water Treatment Works 5: Major Screened Waste
Water Pumping Station 6: Sewers for Adoption
Pumping Station 7: 1960s Pumping
Station 8: Rapid Gravity Filters
for Major Works 9: Bus Station
Development 10: Water Works on the Mersey Ship Canal 11: Potable Water
Booster Station