Case Study 6: Sewers for Adoption Pumping Station
Clayton Reference CP 000037
Site A typical sewers for adoption pumping station (approximately twelve such schemes completed over the last four years).  
Objective To undertake a full upgrade of existing pumping stations or installation of new build stations.
Solution We offered a complete M&E solution including the design, manufacture, supply, installation and commissioning of MCC, valves, pipework, pumps, level controls, flowmeter, telemetry and PID loop controls.
Notes All work was completed on time, working in liaison with civil contractors and including implementation of traffic control systems.    
Customer information available for reference.
Group Companies Group Information Contact & Find Us Group Services Group Services
CASE STUDIES
1: Main Water Filter
for Holiday Town 2: Critical Raw Water
Pumping Station 3: Offshore Water
Treatment Works 4: Major Urban Waste
Water Treatment Works 5: Major Screened Waste
Water Pumping Station 6: Sewers for Adoption
Pumping Station 7: 1960s Pumping
Station 8: Rapid Gravity Filters
for Major Works 9: Bus Station
Development 10: Water Works on the Mersey Ship Canal 11: Potable Water
Booster Station